Railway lines Belgium flooded, repair could take weeks

Situation in Belgium after floods

Rail freight traffic in the southern part of Belgium is severely impacted by heavy rainfall. Railway lines are flooded, and sometimes completely washed away. The damage on the tracks is considerable, and it will take a while before traffic is back to normal, said infrastructure manager Infrabel.

Do you want to read the full article?

Are you already a member?

Log in

Having problems logging in? Call +31(0)10 280 1000 or send an email to customerdesk@promedia.nl.

 

Author: Majorie van Leijen

Majorie van Leijen is the editor-in-chief of RailFreight.com, the online magazine for rail freight professionals.

Add your comment

characters remaining.

Log in through one of the following social media partners to comment.

Railway lines Belgium flooded, repair could take weeks | RailFreight.com

Railway lines Belgium flooded, repair could take weeks

Situation in Belgium after floods

Rail freight traffic in the southern part of Belgium is severely impacted by heavy rainfall. Railway lines are flooded, and sometimes completely washed away. The damage on the tracks is considerable, and it will take a while before traffic is back to normal, said infrastructure manager Infrabel.

Do you want to read the full article?

Are you already a member?

Log in

Having problems logging in? Call +31(0)10 280 1000 or send an email to customerdesk@promedia.nl.

 

Author: Majorie van Leijen

Majorie van Leijen is the editor-in-chief of RailFreight.com, the online magazine for rail freight professionals.

Add your comment

characters remaining.

Log in through one of the following social media partners to comment.